Home | FAQ | Share Your Feedback | Contact Us | Sitemap | Français   Facebook
Facebook
Home | FAQ | Contact Us | Sitemap | Français   Facebook
Facebook
Home
About Us
What's new ?
Who we are
Commitment to quality
Community involvement
Careers
Products
White Cedar Shingles
Samples
Quote
Natural
Factory Coated Shingles
Victorian Series
Laths
Fence Boards and Moulded Pickets
By-products
100% Green
Photo Gallery
Technical Information
Calculator
Installation
Best Product
Material Safety Data Sheet
Warranties
MAIN CATEGORY
Dealers
FAQ
Share Your Feedback
Contact Us
Sitemap

Français
blank image blank image

Articles > Installation for cedar Weathering shingle

NOTE: Recommended on a 3/12 roof slope or greater

Step 1:           
Install plywood deck onto roof rafters.

Step 2:            
Install 30 lb. roofing felt over entire roof deck. Felt should extend 1/4" beyond edge of roof deck. Overlap layers at least 4" working toward the ridge.

Step 3:            
Tack down Cedar Breather. One tack (or nail) approximately every 3 square feet is adequate. Install with dimples down to present the flat side as the nailing surface. Do not lap layers of Cedar Breather. Each course should butt against previous course. Work from fascia to ridge while installing shingles to avoid walking directly on Cedar Breather (may be slippery, especially when wet).

Step 4:            
Install cedar shingles per manufacturer’s instructions. Utilize a nail length that will allow for 3/4" penetration into sheathing. Allow 1/4" for Cedar Breather thickness.




Back to articles list